Deutsche Bahn (DB) has operationalised the 123-km Erfurt-Leipzig/Halle high-speed rail (HSR) line, built at an investment of EUR2.74 billion. The line comprises three tunnels of total length 15.4 km a...

This content is available to only subscribers.